Brief
Audience and merchandise.
Coordinate a promotional product decoration supplier across client artwork, promo product patches and branded merchandise decoration. Quote each campaign with distributor pricing, controlled proofs, job packing and delivery instructions.


Audience and merchandise.
Items and decoration.
Client approval.
Controlled versions.
Pack and ship.
Transfers, patches and labels.
Small curved decoration and badges.
Patches, logos and sparkling surfaces.
Keychains, charms and component branding.




Use line items that can be reviewed and approved without ambiguity.
| Field | Required detail |
|---|---|
| Product | Item and material |
| Decoration | Type, size and colours |
| Quantity | Version and destination split |
| Packing | Unit, carton and documents |
| Schedule | Proof and delivery dates |
Artwork, scale and placement.
Material, finish and application.
Approved code and tolerances.
Labels, documents and presentation.
Define neutral cartons, paperwork, sender details and internal labels before production.
Provide ship-to names, addresses, quantities, references and required arrival dates.
Reference the prior item code and state any artwork, quantity, packing, destination or product change. A new merchandise substrate may require a fresh application trial.
High-quality Embroidery Thread · MOQ 100
View product →Canvas · MOQ 50
View product →Crystal Stones, Metal · MOQ 50
View product →Rhinestone and cloth · MOQ 50
View product →TPU · MOQ 100
View product →Rhinestone DMC · MOQ 50
View product →Trade programs can be quoted for approved patches, transfers, bags, caps and accessory decoration. State the end product, branding method, quantity and fulfillment needs.
Unbranded or distributor-specified packing can be reviewed. Provide exact carton marks, documents, labels and delivery instructions during quotation.
Yes. Build a line-item schedule for every product, decoration, artwork size, quantity, packing unit and ship-to location.
Use a named job reference, artwork revision and approved proof for each component. Physical samples should be linked to the final production item code.
Split shipment can be quoted when destinations, quantities, labels and delivery dates are supplied in advance.
Construction, dimensions, colours, setup, total quantity, number of versions, packing, freight and schedule all affect the price.
Include artwork, products, quantities, proof dates, packing and destinations.